Cobb Environmental Projects


Client Facility Start Date Project Duration
Cobb Cheatham Rd. Balefill 1994 Semi-Annual Groundwater Monitoring 2
    1995 Corrective Action Work Plan 1
    2003 Semi-Annual Groundwater Monitoring 7
         
  Co. Farm Dr. 1994 Semi-Annual Groundwater Monitoring 2
    1995 Methane Well Installations 1
    2003 Semi-Annual Groundwater Monitoring 7
         
  Co. Farm Rd. 1994 Semi-Annual Groundwater Monitoring 2
    1995 Methane Well Installations 1
    2003 Semi-Annual Groundwater Monitoring 7
         
Average of Duration       3.3

Environmental Images

Possible environmental concerns noted during a Phase I EA - These tanks have secondary containment now but has that been properly maintained?Possible environmental concerns noted during a Phase I EA - These tanks have secondary containment now but has that been properly maintained?
Possible environmental concerns noted during a Phase I EA - These tanks have secondary containment now but has that been properly maintained?
A scrap metal collection site at a closed landfillA scrap metal collection site at a closed landfill
A scrap metal collection site at a closed landfill