Fayette Environmental Projects



Client Facility Start Date Project Duration
Fayette First Manassas -
Northside MSWL
1995 Groundwater Monitoring Well Installations 1
      Methane Monitoring Well Installations 1
      Quarterly Methane Monitoring 14
      Semi-Annual Groundwater Monitoring 14
    2002 Methane Remediation Plan 1
         
  First Manassas –
Southside MSWL
1995 Groundwater Monitoring Well Installations 1
      Methane Monitoring Well Installations 1
      Methane Remediation Plan 1
      Quarterly Methane Monitoring 14
      Semi-Annual Groundwater Monitoring 14
    2000 Assessment of Corrective Measures 2
         
Average of Duration       5.8

Environmental Images

Installation of a Landfill Gas vent trenchInstallation of a Landfill Gas vent trench
Installation of a Landfill Gas vent trench
Sediment ponds are required for landfills. Where ponds have aboveground embankments, the embankments must be kept clear of trees to prevent root tunnels.Sediment ponds are required for landfills. Where ponds have aboveground embankments, the embankments must be kept clear of trees to prevent root tunnels.
Sediment ponds are required for landfills. Where ponds have aboveground embankments, the embankments must be kept clear of trees to prevent root tunnels.