UST Service Details

Well and Treatment System Installations

Service options can include the following items:

  • AEM will install eight (8) 6-inch diameter recovery wells and nine (9) two inch diameter monitor wells (piezometers).
  • Install recovery well manholes and piezometers.
  • Install systems (2) with associated electrical connections and plumbing including trenching and locking privacy fences.
  • Provide installation Documentation Report.

Monitor Well Installations

Service options can include the following items:

  • Provide weekly site visits.
  • Provide quarterly site visits with sampling and quarterly report.

Spill Prevention Countermeasures and Control Plan (SPCC)

AEM can perform a Spill Prevention Countermeasure & Control Plan (SPCC) relative to Underground Storage Tank projects in full accordance with Georgia EPD and US EPA Regulations. The SPCC Plan will be prepared as required by a Georgia Registered Professional Engineer.

More information relating to SPCC methodologies.

Environmental Images

Sediment ponds are required for landfills. Where ponds have aboveground embankments, the embankments must be kept clear of trees to prevent root tunnels.
Sediment ponds are required for landfills. Where ponds have aboveground embankments, the embankments must be kept clear of trees to prevent root tunnels.28-Feb-2007 18:26, SONY DSC-W70, 2.8, 6.3mm, 0.033 sec, ISO 320
 
Possible environmental concerns noted during a Phase I EA
Possible environmental concerns noted during a Phase I EA