Drilling Fees
Item | Unit Rate | Units | Notes |
---|---|---|---|
2″ Well Installation in Core/AR Hole | $17.00 | Foot | |
24-inch Plastic Liner (1.5″ Diameter) | $2.60 | Liner | |
24-inch Plastic Liner (5/8″ Diameter) | $2.35 | Liner | |
Air Rotary – 4″ Boring | $40.00 | Foot | |
Air Rotary – Setup Charge | $250.00 | Boring | |
Arch Pump Rental | $120.00 | Day | |
Arch Pump Tubing | $0.20 | Foot | |
Bentonite Backfill – 8″ Boring | $5.50 | Foot | |
Bentonite Backfill – Probe Hole | $3.00 | Foot | |
Coring – NQ (0′ to 10′ Run) | $70.00 | Foot | |
Coring – NQ (10′ to 20′ Run) | $60.00 | Foot | |
Coring – NQ (over 20′ Run) | $50.00 | Foot | |
Coring – Setup Charge | $250.00 | Boring | NQ or HQ |
Coring – Temporary Casing | $5.50 | Foot | |
Coring – Transport Water | $165.00 | Hour | |
Coring – Water Truck | $130.00 | Day | |
Diffcult Moving | $190.00 | Hour | |
Drill Crew Labor | $80.00 | Hour | Includes 2 crew members |
Drill Crew Per Diem | $80.00 | Day | Per crew member |
Drill Rig with 2-man Crew | $175.00 | Hour | |
Drums – 55 Gallon, DOT-Approved | $65.00 | Drum | |
End Caps for Liners | $0.25 | Cap | |
Environmental Daily Rate | $1,700.00 | Day | |
Environmental Samples – Extra | $30.00 | Sample | |
Environmental STB – Grout Backfill | $25.00 | Foot | |
Environmental STB – Soil Backfill | $16.00 | Foot | |
Equipment Decontamination | $110.00 | Hour | |
Geotechnical SA | $8.00 | Foot | |
Geotechnical Samples – Extra | $25.00 | Sample | |
Geotechnical STB – N<60 | $10.00 | Foot | Includes 4 samples in top 10 feet |
Geotechnical STB – N>60 | $11.25 | Foot | Includes 4 samples in top 10 feet |
Minimum Charge – ATV | $1,600.00 | Day | |
Minimum Charge – Truck | $1,300.00 | Day | |
Mobilization – ATV (Local) | $550.00 | Event | Less than 50 miles roundtrip |
Mobilization – Long Distance | $3.25 | Mile | In addition to Local Mobilization charge |
Mobilization – Track Rig | $620.00 | Event | Less than 50 miles roundtrip |
Mobilization – Truck (Local) | $400.00 | Event | Less than 50 miles roundtrip |
Monitoring Well – 2″ PVC (GW) | $40.00 | Foot | Includes samples and grout |
Monitoring Well – 2″ PVC (Methane) | $25.00 | Foot | Includes samples and grout |
Monitoring Well – 2″ PVC Temporary | $24.00 | Foot | |
Monitoring Well – 4″ PVC | $60.00 | Foot | Includes samples and grout |
Peristaltic Pump Rental | $40.00 | Day | |
Polyethylene Peristaltic Pump Tubing | $0.65 | Foot | |
PVC Riser – 3/4″ Diameter | $2.75 | Foot | |
PVC Screen – 3/4″ Diameter | $4.00 | Foot | |
Shelby Tube Sample | $58.00 | Sample | |
Shelby Tube Sample Attempt | $26.00 | Attempt | |
Soil Probe Rig – ATV | $1,700.00 | Day | |
Soil Probe Rig – Truck | $1,450.00 | Day | |
Standby | $175.00 | Hour | |
Steam Cleaner Rental | $120.00 | Day | |
Teflon Peristaltic Pump Tubing | $3.00 | Foot | |
Well Apron – 2′ Square | $250.00 | Apron | Includes 8″ Flush or 4″ by 5′ Standup Casing |
Well Apron – 3′ Square | $400.00 | Apron | Includes 8″ Flush or 4″ by 5′ Standup Casing |
Our Estimated Service Fees and Charges represent an approximation of AEM’s charge for monitoring, tests or services for your company or facility. This does not constitute a proposal for these services. A formal proposal will be prepared for your facility upon request.
If you have additional questions or would like to request a proposal please contact your account representative directly or contact us for an RFP by completing our contact form.